TT Preshaded

Easy Mill, Preshaded A1-D4

  • Simpler & Quicker: Faster milling with pre-formed color.
  • Single Base Color: Flexible external characterization.
  • Flexural Strength 690 MPa
  • Translucency 49%
  • Type 5Y-ПСЗ

PROCEDURE

  1. Block Блок
  2. Milling Фрезеровка
  3. Sintering Спекание
  4. Polishing Полировка
  5. Glazing Глазирование
  6. End Конец

COLORS

Vita 16 colors

A
  • A1
  • A2
  • A3
  • A3.5
  • A4
B
  • B1
  • B2
  • B3
  • B4
C
  • C1
  • C2
  • C3
  • C4
D
  • D2
  • D3
  • D4

APPLICATION

  • Crowns Коронки
  • Inlay/Onlay/Veneer Инлеи/Онлеи/Виниры
  • 3-unit Bridge Мост из 3 элементов
  • Implant Crown Коронка на импланте

SINTERING

The restoration must be placed upside down on the zirconia bean in sintering tray.
Please be attention to avoid adhesion on zirconium bean. The sintering temperature is as follows for your reference.

The real temperature inside of the furnace must be tested before sintering to ensurethe consistency of the sintering temperature and the program temperature.

Standard Sintering

The peak temperature 1450 ℃ must be kept in 2 hours.

TT Preshaded standard sintering curve

Конечно, мы настоятельно рекомендуем многослойные блоки циркония 3D pro Gradient. Он имеет широкую индикацию от переднего до полного зубного ряда; это может повысить эффективность работы лабораторий и сэкономить все ваши затраты.

Exactly. We have 12 years of production experience with our own professional production team and complete production facilities. All blocks are produced in our own manufacturer.

Firstly you can list what you want to us, we will check the whole cost for you included the freight, then you can pay the amount in PI. After you paid, we will arrange the delivery in 3 days for small quantity, and mass quantity in 5-10 days. At last, the ETA is 3-7 days approx. to your destination by UPS, DHL and FedEx etc.

You can pay us by Paypal, Western Union, TT, L/C for your convenience.

It depends on your quantity. Small quantity is 3-10 days approx. Mass quantity is in 7-10 days, and the international shipment by express takes 5-7 days approx.